ENTA Treatment Systems Engineering Contracting Corporation
Duzce Orthopaedic Disabled Elementary School / Yilmaz Cons – Case Study
Nov. 2, 2018
Project Name
Duzce Ortopedik Ozurliiler Okulu Wastewater Treatment Plant
Employer
Yilmaz insaat A.S.
Contractor
Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti.
Location of the plant
Duzce/TURKEY
Scope of work
Domestic Wastewater Package Treatment Plant
Contract Date
2002
Completion date
2003
Flowrate of the plant: 75 m3/day
Inlet Pollution Parameters:
BOD: 75 mg/ L
COD: 300-400 mg/ L
SS: 200 mg/ L
Outlet Discharge Values:
BOD: 45 mg/ L
COD: 120 mg/ L
AKM: 45 mg/ L
SS: 6-9
Units of the Plant:
Physical Treatment Unit
- Static Screen
Pre-Treatment Unit
- Equalization Tank
- Neutralization Basin
Biological Treatment
- Aeration Tank with Blower and Diffuser
- Sedimentation Tanks
Sludge Dewatering
- Sludge Thickening Tank
- Filter press