Puretech Systems Limited articles
- Project: Commercial Albumin Production Plant Capacity Expansion
- Client: Albumedix Limited
- Main Contractor: Scitech UK
- Duration: May 2019 – November 2020
Puretech designed, manufactured, installed and commissioned a fully validated system for the generation and distribution of essential pyrogen free water to replace the existing legacy system at Albumedix’s facil
Hospitals throughout the world, working towards improving the lives and outcomes for cancer sufferers, are using MRI (magnetic resonance imaging) scanners to diagnose and stage cancer in patients. Whilst the magnetic fields and radio waves used by MRI scanners pose no risk to humans, scanners’ cooling system potentially do, and careful installation and maintenance is essential to ensure their safe operation.
The magnets in MRI scanners are cooled with liquid helium, with the ave
- Project: Dragon’s Heart Hospital Principality Stadium
- Client: N G Bailey / Cardiff & Vale University Health Board
- Timing: April 2020
- Value: £1.6M
Without oxygen the Dragon’s Heart Hospital, conceived as a response to the coronavirus pandemic, could not function. Demonstrating outstanding commitment, the Medical Gases’ team designed,
- Project: Epsom University Hospitals Covid-19 Wards
- Client: Interserve / Epsom and St Helier University Hospitals
- Timing: 25th – 28th March 2020
- Value: £1.6M
Medical Gases completed a project, including over 1000 meters of pipe