Gas Turbine Articles & Analysis
8 articles found
St. Joseph's Hospital Health Center is a 451 bed hospital in Syracuse, NY. In 2009, St. Joseph's began a $220 million expansion, including a new surgical tower, new emergency services building, an emergency psychiatric program, and an energy-efficient data center. Completed in 2015, the expansion meets LEED Gold certification, the second-highest LEED tier. The expansion incorporated maximization ...
Medical Center Improves Reliability with Natural Gas-Fired Cogeneration Plant. Faced with the need to replace 50-year-old natural gas steam boilers with costly new ones, a major university medical center instead invested in a cogeneration facility that generates nearly all its electricity and creates low-cost steam as a ...
Albany Medical Center in downtown Albany, NY encompasses the 651-bed Albany Medical Center Hospital, as well as the 550-student Albany Medical College. It is a Level-I Trauma center, and the only academic health sciences center in Northeastern New York State. In 2013, Albany Medical Center underwent a $330 million expansion of the Medical Center Hospital. Not only does the expansion allow for ...
On the windy high plains in the Western USA, a major petroleum company has been contributing to the U.S. energy landscape with their 420 MMSCFD cryogenic gas processing train to process raw natural gas. For the critical service of residue/sales gas compression for this process, the customer's project team selected two Titan 130 compressor sets ...
Quick Facts LOCATION: Rochester, Minnesota MARKET SECTOR: Healthcare FACILITY SIZE: 3 Million Square Feet, 960 Licensed Beds FACILITY PEAK LOADS: Electric: 12.0 Megawatts Heating: 130,000 lb/hr Steam Cooling: 7,500 Tons TOTAL CHP GENERATING CAPACITY: 7.75 Megawatts HEAT RECOVERY RATE: 24,000 lb/hr of 250 psig Steam HEAT RECOVERY UTILIZATION: Building heating or cooling, medical equipment ...
Quick Facts LOCATION: San Diego, CA MARKET SECTOR: Hospital FACILITY SIZE: 1,030,000 square feet FACILITY PEAK LOAD: 6.8 MW EQUIPMENT: 4.6 MW Solar Turbines Mercury™ 50 gas turbine, absorption chiller FUEL: Natural Gas USE OF THERMAL ENERGY: Space and autoclave heating, absorption chilling and domestic hot water CHP TOTAL ...
Quick Facts LOCATION: Chicago, Illinois PRIME MOVER: (1) Solar Centaur 40TM Natural Gas Turbine GENERATING CAPACITY: 3,419 kW HEAT RECOVERY EQUIPMENT: (1) Kentube Heat Recovery Steam Generator 50,000/15,000 lbs/hr (fired/unfired) (1) 800 ton Absorption Chiller HEAT RECOVERY APPLICATION: Building Heat, Absorption Cooling IMPLEMENTATION COST: $12.5 million (energy ...
Quick Facts LOCATION: Chicago, Illinois PRIME MOVER: (1) Solar Centaur 40TM Natural Gas Turbine GENERATING CAPACITY: 3,419 kW HEAT RECOVERY EQUIPMENT: (1) Kentube Heat Recovery Steam Generator 50,000/15,000 lbs/hr (fired/unfired) (1) 800 ton Absorption Chiller HEAT RECOVERY APPLICATION: Building Heat, Absorption Cooling IMPLEMENTATION COST: $12.5 million ...
