Heat Exchanger Replacement Articles & Analysis
1 articles found
Thermal Energy International demonstrated that by replacing the existing traps with the GEM venturi orifice design, blocked steam traps could be prevented from impacting on production and start-up times, and by efficiently returning condensate back to the boilers maximum energy savings would be achieved. All 92 mechanical traps installed on industrial steam and some clean steam ...
